Willow Glen Road & Nichols Canyon – H28A |
Crescenta Valley Water District |
October-07 to March-08 |
Install 12" & 6" CML & CMC steel water pipeline and appurtenant construction. Install 6" Fire Hydrant and steel water pipe laterals and appurtenant construction. Relocation of Customer In-house Plumbing. Installation of Pressure Reducing Valves |
First Street Water Main & First Street Sewer Main |
City of Santa Ana |
December-07 to March-08 |
Install 12-inch and 8-inch class 200 AWWA C900 PVC Water Main, construct 1-inch, 2-inch and 3-inch water service, 12-inch 1" and 8" gate valve, fire hydrant assembly. Construct 12" and 8" sewer main, sewer manhole and 6" PVC sewer lateral. |
Subdrain Improvements in Calle Carrillo |
City of San Dimas |
March-08 to March-08 |
Construct Trench Drain System including 12" PVC Perforated Pipe, complete in place. Construct Concrete Blanket Protection per A.P.W.A. Std. No. 225-1, complete in place. Construct Lateral Drain System, complete in place. |
Santa Clara & Lyon – PCO #2/ Project No. 06-1012 |
City of Santa Ana |
December-07 to March-08 |
Install Hot Tap, Water Line and Future Water Service 6-inch. |
Garden Grove Blvd – Palm Street Sewer Improvements |
City of Garden Grove |
March-08 to May-08 |
6" and 8" PVC pipe & fittings, 6" and 12" GV, C-509 (FLG X MJ / valve can assembly reconnect existing laterals, |
Nevada Street Storm Drain |
Weiss Properties |
April-08 to May-08 |
36" – R.C.P. storm drain, 18" laterals |
Relocate 5 Sewer Laterals- Sunset Beach |
County of Orange |
June-08 to June-08 |
Install 6" ABS sewer lateral (using INSERTA TEE) at various locations |
Willow Glen Road & Nichols Canyon – H28A |
City of Los Angeles |
May-08 to August-08 |
Installation of sewer main, and tie-ins to house connection. |
Canyon Drive & Spring Oak – H32A |
City of Los Angeles |
May-08 to July-09 |
Remove & replace 6-inch and 8-inch VCP sewer., install maintenance holes, adjust MH to grade, remove flush tank mechanism, rehabilitate sewer by lining, clean and CCTV sewer |
Veteran Ave and Sunset Blvd-SSRP-U18B |
City of Los Angeles |
April-09 to February-10 |
Remove & replace 6-inch and 8-inch VCP sewer., install maintenance holes, adjust MH to grade, remove flush tank mechanism, rehabilitate sewer by lining, clean and CCTV sewer |
Lincoln Avenue – East Street to Larch Street and Sewer Diversion at State College Blvd/Almond Ave |
City of Anaheim |
March-09 to March-09 |
Furnish and install 12" DIP, 8" DIP, 6" fire hydrant, cut & cap existing fire hydrant, 12"resiliant wedge gate valve, 18" connection to existing pipe, 1" air release and vacuum relief valve. |
Harbor UCLA Sewer Project No. 721-014.00 |
MTM Construction, Inc |
March-09 to April-09 |
INSTALL 4" SDR-35 (APROX 200 LF) CORE INTO EXISTING MANHOLE, 3 CLEANOUTS, SLURRY BACKFILL |
Construction Services for Emergency Sewer & Storm Drain Repairs |
City of Glendale |
N/A |
On-call/emergency list for sewer and storm drain repairs. |
Water Main Replacement Project |
City of Arcadia |
May-09 to August-09 |
Furnish and install 2-inch water svc & 6" fire hydrant assembly, 10" class 52 DI pipe bore and jack 6" and 8" DI pipe, hot tap existing 12-inch pipe, furnish & install 4′ x 5′ deep concrete vault, flow meter, control valve, nitrate analyzer assembly. |
Central Avenue House Connection |
City of Montclair |
May-09 to May-09 |
Installation of VCP to property line, saddle on mainline, sewer lateral from property line to back of house, fill septic tank with sand and abandon. |
12" Water Main- Lincoln Ave from East St to La Plaza St |
City of Anaheim |
July-09 to October-09 |
Furnish and install 12" DIP, 8" DIP, 6" fire hydrant, cut & cap existing fire hydrant, 12"resiliant wedge gate valve, 18" connection to existing pipe, 1" air release and vacuum relief valve. |
Cistern 3 Vault Repair Project |
Long Beach Water Department |
October-09 to October-10 |
Remove and replace existing master backwash and 24-inch ball valve and actuator, repair cistern vault and piping, sheeting shoring and bracing. |
1275-1287 East Lincoln Avenue – Water Service Connection |
Portrait Homes |
September-09 to October-09 |
8" double-detector check assembly, lateral to property line, extend fire hydrant assembly, 2" irrigation meter, 2" RP backflow, 3" compound meter w/4" service, 4" double-detector check assembly. |
Redlands Boulevard to Park Avenue – Installation of Water Main |
Weiss Properties |
September-09 to September-09 |
Install new 4×8 water meter vault , move double-detector assembly, install new 2" svc, construct manhole, encase 24" sewer, 2’x1′ concrete box, construct catch basin. |
San Gabriel High School – Booster Pump and Water Main Installation |
Alhambra Unified School District |
October-09 to June-10 |
Connection at 4" backflow preventer, install 4" C900Cl200, pump station, pressure test. |
Phase I Roadway Extensions Forest Lawn Covina Hills |
Forest Lawn Memorial Park Association |
January-10 to present |
Install air release above ground, domestic mainline in 2" and 12" HDPE, irrigation main line 6", 10" 12", 14", 16" HDPE, Irrigation main line transition and 12" AVL valve, gate valve, sanitary sewage piping, storm drain installation. |
AUSD Transportation Bus Storage |
Alhambra Unified School District |
February-10 to May-10 |
Connection at 4" backflow preventer, install 4" C900Cl200, pump station, pressure test. |
Magnolia Drive Sewer Repair – Forest Lawn Hollywood Hills |
Forest Lawn Memorial Park Association |
March-10 to April-10 |
Install 8” VCP , connect to existing HC Sewer, install maintenance hole, CCTV |
Street Repair and Rehabilitation Project – Phase I (Chevy Chase Drive) |
City of Glendale |
April-10 to April-10 |
Installation of two (2) manholes including: dewatering, over excavating all mud and/or unsuitable material(s), extra miscellaneous shoring in deep hole, approximately 30∓ LF of 8-inch sewer pipe. |
Sewer Repair At Various Locations- City of Pomona |
City of Pomona |
May-10 to June-10 |
Remove and Replace 8-inch VCP Point Repairs. Remove and Replace 8-inch VCP Facility Replacement |
SSRP S15 Grand Ave & 58th Street W.O. SZC 11889 |
City of Los Angeles |
August-10 to present |
Remove & replace 8-inch and 15-inch VCP sewer., install maintenance holes, remove flush tank mechanism and remodel MH Base, rehabilitate sewer by lining, clean and CCTV sewer |
City of Pasadena – 2010 Sewer Capacity Upgrades |
City of Pasadena |
June-10 to August-10 |
Remove & replace 8-inch and 12-inch VCP sewer. Remove & replace 8-inch and 12-inch VCP sewer with Ductile Iron Pipe with Protecto 401 Ceramic Epoxy lining. Construct concrete encasement, remove and reconstruct manhole floor, and CCTV sewer |
SSRP P18A Eagle Rock Blvd & York Blvd. W.O. SZC 11840 |
City of Los Angeles |
September-10 to Present |
Remove & replace 8-inch and 10-inch VCP sewer., Reconnect existing HC Sewer, install maintenance holes, remove flush tank mechanism and remodel MH Base, rehabilitate sewer by lining, clean and CCTV sewer |
SSRP P12 Avenue 50 and Monte Vista Street SZC 11960 |
City of Los Angeles |
December-10 to Present |
Remove and Replace 8-inch VCP Point Repairs. Remove and Replace 7 8-inch VCP Facility Replacement |
SSRP P13 Range View and North Avenue SZC 11961 |
City of Los Angeles |
December-10 to May-11 |
Remove & replace 8-inch and 15-inch VCP sewer., install maintenance holes, remove flush tank mechanism and remodel MH Base, rehabilitate sewer by lining, clean and CCTV sewer |
Pipeline and Manhole Rehabilitation for Various Locations |
City of Beverly Hills |
March-11 to June-11 |
Sewer line spot repairs in various locations ranging from 6-10" VCP including furnish and installing manholes. |
Empress Avenue, Crestlake Avenue, Elm Park Imrpovement Project |
City of South Pasadena |
July-10 to August-10 |
Remove and Replace 8-inch VCP Sewer and Point Repairs, and House Connections. |
Magnolia Avenue Emergency Repair – W.O. SWC 01819 |
City of Los Angeles |
October- 11 |
Remove and replace broken sewer main on emergency contract. |
Secondary Sewer Renewal Program (SSRP) T03 – Paseo Del Mar & Carolina Street SZC 11849 |
City of Los Angeles |
September-11 |
Remove and Replace &/or rehab over 3 miles of 8-inch and 10-inch sewer lines as part of the Wastewater Collection System Settlement agreement |
Indiana Avenue Street Improvement Project |
City of South Pasadena |
November- 11 |
Remove and Replace sewer and existing house connections with 8" VCP. |
Water Main Replacement Project |
City of Santa Monica |
May- 12 |
Remove and Replace D.I.P. including appurtenances |
Secondary Sewer Renewal Program (SSRP) U22A – Mullholland |
County of Los Angeles |
May- 12 |
Remove & Replace &/or rehab 4.56 mi sewer lines in the W LA area for the Wastewater Collection System Settlement Agreement |
Hemlock Avenue Sewer Replacement |
City of Carlsbad |
April- 12 |
Remove and replace VCP sewer including associated laterals. |
Oceangrove Drive Sewer Reconstruction |
County of Los Angeles |
July- 12 |
Remove and replace VCP sewer. |
783 Bel air Road |
City of Los Angeles |
June- 12 |
Remove and Replace approximately 250 LF of 6 and 8 inch VCP on property easement. |
Electric Avenue & San Juan Court |
City of Los Angeles |
April- 12 |
Remove and Replace storm drain maintenance hole in Venice Beach. |
Secondary Sewer Renewal Program (SSRP) C03 – Venice Boulevard & Stewart Avenue SZC – 12087 |
City of Los Angeles |
September- 12 |
Remove & replace (R/R) &/or rehab about 6 miles of 8-in, 10-in, and 12-in sewer lines in the Palms-Mar Vista-Del Rey-Venice area for the Wastewater Collection System Settlement Agreement – 60 Mile Program |
Baldwin Avenue and Old Ranch Road Sewer Capacity Improvement Project |
City of Arcadia |
September- 12 |
Installation of of 12-inch and 915LF of 15-inch VCP, maintenance hole reconstruction and connection of laterals. |
City of Industry Recycled Water Pipeline Phase IIB, Package 4 |
Upper San Gabriel Valley Municipal Water District |
November- 12 |
Remove and Replace 7,535 LF of 4-inch PVC, 3,320 LF of 6-inch PVC, 3,968 LF of 8-inch PVC, 2,856 LF of 12-inch PVC |
Secondary Sewer Renewal Program (SSRP) T01 3rd Street and Mesa Street & T05 Channel Street and Gaffey Street |
City of Los Angeles |
November- 12 |
Remove & replace (R/R) &/or rehab about 5.44 mi of 8-in, 10-in, & 12-in sewer lines in San Pedro for the Wastewater Collection System Settlement Agreement – 60 Mile Program |